Customization: | Available |
---|---|
Material: | 65mn |
Application: | Liquid Filtration, Screening, Solid-Liquid Separation, Gas-Liquid Separation, Dry Filtration, Dustproof, Gas Filtration, Screen |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Vibrating Screen Mesh |
Material | 65Mn, 45#, 50#, 55#, 60#, 70#, 72A |
Wire diameter | 0.8mm-12.7mm |
Mesh hole | 2mm to 100mm |
International Certification | SGS standard,ISO9001:2008 |
1. Angle: 30 degrees, 45 degrees,60 degrees
2. Crimped Wire Mesh Shape: v-shaped, u-shaped
3. Hook Type: C or U hook for 30°-180°
4. Weaving Type: Double crimped, intermediate crimped, flat top crimped, lock crimped.
5. Mesh Type: Square, rectangular slot, long slot.
6. Surface Treatment: Anti rust oil painted.
7. Edge Preparation: Plain, bent, reinforced shroud, welded shroud, bolt shroud.
NO.
|
Grade
|
Chemical Composition % |
||
c |
si |
mn |
||
1 |
45 |
0.42-0.50 |
0.17-0.37
|
0.50-0.80
|
2 |
50 |
0.47-0.55 |
||
3 |
55 |
0.52-0.60 |
||
4 |
60 |
0.57-0.65 |
||
5 |
65 |
0.62-0.70 |
||
6 |
70 |
0.67-0.75 |
||
7 |
65Mn |
0.62-0.70 |
0.90-1.20 |
|
8 |
72A |
0.70-0.75 |
0.15-0.35 |
0.30-0.60 |
Anping Shitai Wire Mesh Products CO., LTD
Q:Are you factory or Middleman?
A:Yes, we have been in providing the professional products in fence field for 16 years.
Q: Can you offer free sample?
A:Yes, but usually the customer need to pay the freight.
Q:Can I customize the products?
A:yes, as long as provide specifications, drawings, can only do what you want products.
Q: How about the delivery time?
A:Usually within 15- 20days,customized order may need longer time.
Q:How many days you need to produce one container fence?
A:Production Time: 12-15 days for one container.